Caple C602E Manual de instalación Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
Revision 1.9 - 18 -
5.2
Trailer Installation
5.2.1
Different mounting setups for trailer applications
1) Rapid mount bolt-on
Includes bolt on sub frame with lift gate slide rails, frame and platform preinstalled ready to lift up and
bolt into existing sliding tandem rails on trailer
7
0
0
Figure 10 Rapid mount bolt-on setup
2) Quick mount weld-on
Includes weld-on subframe with lift gate slide rails, frame and platform preinstalled ready to lift up and
weld onto trailer cross members
Figure 11 Quick mount weld-on setup
Height of subframe (in each case) is determined by bed height and arm length. PALFINGER Liftgates
chooses the optimal subframe height based on customer supplied truck dimension sheet (see 3 Chassis
Dimension Sheets).
On low bed height trailers, slider rails can get welded directly to trailer cross members. Always
make sure to double-check supplied drawing for correct installation setup.
Mounting bolts
(5ea side, 2 in
front, 3 in back)
1
2
3
4
5
Preattached
sub frame
assembly
Weld
inside
and outside
of subframe
to all cross
members for
maximum
strength and
safety
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 39 40

Comentarios a estos manuales

Sin comentarios